Wrapped Herculis Gold Coin — version comparison

Back to wXAUH

From

Update XAUH.md

27 Sept 2026, 15:10 UTC · PaoloDiStef · 04725b0 · assessments/draft/XAUH.md

view this version

To

Update XAUH.md

28 Sept 2026, 07:58 UTC · PaoloDiStef · 2087a99 · assessments/draft/XAUH.md

view this version

Structured data (0 changes)

No changes in the frontmatter between these versions.

Narrative (markdown)

assessments/draft/{XAUH.md@04725b0 → XAUH.md@2087a99} RENAMED
@@ -124,6 +124,6 @@
124
 
125
  The proposed retained reserve of 25% is appropriate relative to expected market volatilty of the underlying gold exposure, and leaves a substantial buffer for liquidation execution. It should not be interpreted as protection against issuer, custody, redemption, admin-control, or liquidity tail risks. Those risks are addressed primarily through the proposed 250,000 ZCHF global minting limit and the 2.5% target interest rate.
126
 
127
- The target interest rate of 2.5% is justified by the selected risk premia: 1.00% for issuer, custody, and redemption dependency, 0.5% for smart-contract and admin-control risk, 0.5% for governance risks, and 0.5% for liquidity risk as described.
128
 
129
  The proposed 250,000 ZCHF global minting limit is the primary safeguard as long as the free float and liquidity of the token are limited. The issuer has however indicated plans of growing the Ethereum version with additional integrations and CEX listings. A higher global minting limit should then be possible.
 
124
 
125
  The proposed retained reserve of 25% is appropriate relative to expected market volatilty of the underlying gold exposure, and leaves a substantial buffer for liquidation execution. It should not be interpreted as protection against issuer, custody, redemption, admin-control, or liquidity tail risks. Those risks are addressed primarily through the proposed 250,000 ZCHF global minting limit and the 2.5% target interest rate.
126
 
127
+ The target interest rate of 2.5% is justified by the selected risk premia: 1.00% for counterparty risk, 0.5% for smart-contract, 0.5% for governance risks, and 0.5% for liquidity risk as described.
128
 
129
  The proposed 250,000 ZCHF global minting limit is the primary safeguard as long as the free float and liquidity of the token are limited. The issuer has however indicated plans of growing the Ethereum version with additional integrations and CEX listings. A higher global minting limit should then be possible.
assessments/draft/{XAUH.md@04725b0 → XAUH.md@2087a99} RENAMED
@@ -124,6 +124,6 @@
124
124
 
125
125
  The proposed retained reserve of 25% is appropriate relative to expected market volatilty of the underlying gold exposure, and leaves a substantial buffer for liquidation execution. It should not be interpreted as protection against issuer, custody, redemption, admin-control, or liquidity tail risks. Those risks are addressed primarily through the proposed 250,000 ZCHF global minting limit and the 2.5% target interest rate.
126
126
 
127
- The target interest rate of 2.5% is justified by the selected risk premia: 1.00% for issuer, custody, and redemption dependency, 0.5% for smart-contract and admin-control risk, 0.5% for governance risks, and 0.5% for liquidity risk as described.
127
+ The target interest rate of 2.5% is justified by the selected risk premia: 1.00% for counterparty risk, 0.5% for smart-contract, 0.5% for governance risks, and 0.5% for liquidity risk as described.
128
128
 
129
129
  The proposed 250,000 ZCHF global minting limit is the primary safeguard as long as the free float and liquidity of the token are limited. The issuer has however indicated plans of growing the Ethereum version with additional integrations and CEX listings. A higher global minting limit should then be possible.